Existing system review
Graphics, navigation, point databases and available supervisory records establish the starting condition.
Service · System Modernization
Confido delivers BMS upgrade and retrofit engineering for buildings with aging, limited or fragmented control systems across the UAE.
Our work can include existing-system assessment, controller replacement, supervisory migration, network modernization, integration of compatible existing field infrastructure and recommissioning.
Existing system assessment
A retrofit begins with the current architecture, available records and operational constraints. The assessment provides the technical basis for a project-specific modernization strategy within the wider scope of BMS & Building Automation.
01
Controller and supervisory platforms are reviewed together with their accessible software, configuration and backup status.
02
Network topology, communication protocols, interfaces and available infrastructure are documented within the assessment scope.
03
Field devices, I/O, wiring and panel conditions are considered in relation to compatibility, serviceability and the proposed design.
04
Drawings, point information, control narratives, software and backups are reviewed where they are available.
05
Operational pain points and operator requirements are examined alongside the way the existing building is currently controlled.
06
Access, system dependencies, compatibility limits and commissioning requirements inform the feasible modernization approach.
Upgrade strategy
The appropriate strategy depends on the installed equipment, compatibility, building operation, access and project requirements. It may combine selective replacement and phased migration rather than treating every legacy component in the same way.
Controller replacement
Legacy controllers are assessed against the required points, sequences, interfaces and field infrastructure. Replacement controllers are selected according to project requirements, with compatibility and panel changes reviewed before testing and recommissioning.
Supervisory migration
Migration considers both the available system data and the way operators use the building. Existing graphics, alarms, schedules, trends, access arrangements and point databases are reviewed before the renewed supervisory environment is developed.
Graphics, navigation, point databases and available supervisory records establish the starting condition.
Alarms, schedules, trends and user access are reviewed against the agreed migration scope.
Point structures and required supervisory functions are transferred or redeveloped for the selected platform.
Graphics and navigation may be renewed where appropriate to the operating requirements and available system information.
Network modernization
Network modernization may address physical infrastructure, communications topology, protocol interfaces, gateways and segmentation. Protocol selection depends on the installed equipment, compatibility and project requirements.
Field infrastructure reuse
Existing field infrastructure may be retained where it is technically viable, compatible, serviceable and appropriate to the updated design. Reuse is determined through assessment; it is not assumed for every device, panel, interface or installation.
Recommissioning
Recommissioning checks the renewed relationship between field points, controller logic, network interfaces and supervisory operation. Testing and handover documentation are aligned with the approved project scope.
Lifecycle & maintainability
Upgrade objectives may include a more maintainable architecture, improved operator visibility, structured records and a clearer path for future integration. The achievable outcome depends on the installed system and approved modernization scope.
Modernization requirements